Port Infrastructure Facilities

     The FSUE "Rosmorport"  Azovo-Chernomorsky Basin Branch disposes of the wide range of objects of coastal and port infrastructure, necessary for implementation of basic Branch activities, specified in the Regulations of the FSUE “Rosmorport” Azovo-Chernomorsky Basin Branch.
     As of 01.01.2026 the 777 stationary real estate objects of different functional purpose, located in seaports of Azov, Anapa, Gelendzhik, Eysk, Kavkaz, Kerch, Novorossiysk, Rostov-on-Don, Sevastopol, Sochi, Taganrog, Taman, Temryuk, Tuapse, Feodosia and Yalta, include:

  • hydrotechnical structures (berths, piers, jetties, breakwaters, bank protection constructions, etc.) – 286 objects, including:
– in Azov Seaport
– 6 facilities;
– in Anapa Seaport – 5 facilities;
– in Gelendzhik Seaport – 14 facilities;
– in Eysk Seaport – 9 facilities;
– in Kavkaz Seaport – 10 facilities;
– in Kerch Seaport – 5 facilities;
– in Novorossiysk Seaport – 72 facilities;
– in Rostov-on-Don Seaport
– 14 facilities;
– in Sevastopol Seaport – 27 facilities;
– in Sochi Seaport – 62 facilities;
– in Taganrog Seaport – 13 facilities;
– in Temryuk Seaport – 3 facilities; 
– in Tuapse Seaport – 31 facilities;
– in Yalta Seaport – 10 facilities,
  • underwater hydrotechnical structures (water areas and water area formations, entrance, approaching and diversion channels) – 20 objects, including: 
– in Azov Seaport
– 1 facility;
– in Gelendzhik Seaport – 1 facility;
– in Eysk Seaport – 2 facilities;
– in Kavkaz Seaport – 2 facilities;
– in Novorossiysk Seaport – 1 facility;
– in Sevastopol Seaport – 1 facility; 
– in Sochi Seaport – 3 facilities; 
– in Taganrog Seaport
– 1 facility;
– in Taman Seaport – 2 facilities;
– in Temryuk Seaport – 2 facilities; 
– in Tuapse Seaport – 4 facilities,
  • buildings and premises (administrative, production, utility, domestic, etc.) – 208 objects, including:  
– in Gelendzhik Seaport – 5 facilities;
– in Eysk Seaport – 15 facilities;
– in Kavkaz Seaport – 12 facilities;
– in Kerch Seaport – 50 facilities;
– in Novorossiysk Seaport – 8 facilities;
– in Sevastopol Seaport – 60 facilities;
– in Sochi Seaport – 14 facilities; 
– in Taganrog Seaport
– 19 facilities; 
– in Tuapse Seaport – 11 facilities; 
– in Feodosia Seaport – 1 facility,    
  • constructions and structures (objects of navigation safety systems, navigation means, roads, sewer, water and storm drainage networks, cabels) – 263 objects, including: 
– in Azov Seaport
– 4 facilities;
– in Eysk Seaport – 23 facilities;
– in Kavkaz Seaport – 15 facilities;
– in Kerch Seaport – 50 facilities;
– in Novorossiysk Seaport – 30 facilities;
– in Rostov-on-Don Seaport
– 1 facility;
– in Sevastopol Seaport – 43 facilities; 
– in Sochi Seaport – 21 facilities; 
– in Taganrog Seaport
– 37 facilities;
– in Temryuk Seaport – 5 facilities;
– in Tuapse Seaport – 25 facilities;
– in Feodosia Seaport – 2 facilities.

 

     Among hydrotechnical structures of the Azovo-Chernomorsky Basin Branch, the biggest part is secured by mooring hydrotechnical structures 207 objects, or 72.4 %, including:
– in Azov Seaport – 6 facilities;
– in Anapa Seaport – 5 facilities;
– in Gelendzhik Seaport – 9 facilities;
– in Eysk Seaport – 7 facilities;
– in Kavkaz Seaport – 4 facilities;
– in Kerch Seaport – 5 facilities;
– in Novorossiysk Seaport – 63 facilities;
– in Rostov-on-Don Seaport
– 14 facilities;
– in Sevastopol Seaport – 24 facilities; 
– in Sochi Seaport – 37 facilities; 
– in Taganrog Seaport
– 8 facilities;
– in Temryuk Seaport – 2 facilities; 
– in Tuapse Seaport – 21 facilities;
– in Yalta Seaport – 1 facility,
     and this concludes 17.1 %; 100 %, 100 %; 46.7 %; 40 %; 17.9 %; 72.4 %; 21.5 %; 24.7 %, 88.1 %; 72.7 %; 9.1 %; 58.3 %; 3,8 % of the total amount of mooring structures in Azov, Anapa, Gelendzhik, Eysk, Kavkaz, Kerch, Novorossiysk, Rostov-on-Don, Sevastopol, Sochi, Taganrog, Temryuk, Tuapse and Yalta sea ports accordingly.

     The total length of the mooring wall of Branch's berths is 32.7 km, being:     
– in Azov Seaport – 1 km;
– in Anapa Seaport – 0.9 km;
– in Gelendzhik Seaport – 0.8 km;
– in Eysk Seaport – almost 1.5 km; 
– in Kavkaz Seaport – almost 0.8 km;
– in Kerch Seaport – 0.6 km;
– in Novorossiysk Seaport – 12.3 km;
– in Rostov-on-Don Seaport – 2.1 km;
– in Sevastopol Seaport – 3.2 km; 
– in Sochi Seaport – 4 km; 
– in Taganrog Seaport
– 1.3 km;
– in Temryuk Seaport – 0.4 km; 
– in Tuapse Seaport – 3.6 km;
– in Yalta Seaport – 0.1 km,
     and this concludes 20.7 %; 100 %; 100 %; 54.7 %; 60.7 %; 12,5 %; 75.9 %; 20.6 %; 32.2 %, 91.5 %; 72.5 %; 12.7 %; 60.6 %; 3,6 % of the total length of mooring walls in Azov, Anapa, Gelendzhik, Eysk, Kavkaz, Kerch, Novorossiysk, Rostov-on-Don, Sevastopol, Sochi, Taganrog, Temryuk, Tuapse and Yalta sea ports accordingly.